Already asking for stabilisation of 1.0 after two weeks. Reason is that 1.0_pre7 has issues with Emacs 23.2, see bug 321499 and bug 336718. Test plan: <http://overlays.gentoo.org/proj/emacs/wiki/test%20plans> Thanks in advance.
amd64 done
x86 stable
sparc stable
ppc stable, closing